Tools:     BSCW      Indico      TWiki      EDMS     Savane    MailingLists

DIgital Library Infrastructure on Grid ENabled Technology
CERN Internal Activity web site - Official Web site: http://www.diligentproject.org

 DoW 3 / 2 / 1 - Effort 3 / 2 / 1 - Review Report 1 - IMRs - Deliverables - DIL-EGEE Interactions
 
Software: repository / etics / integration reports / testing reports / documentation

Infrastructure Monitoring: gCube / gLite

 
WP1.1 Test-bed functional and architectural design

Develop the overall architecture and specifications of the DILIGENT test-bed, ensuring the integration of DILIGENT with the existing Grid infrastructure during the lifetime of the project.

D 1.1.1 Test-bed functional specification (pdf)
D 1.1.2 System Architecture and Grid-references
From M3 to M16
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
48,01 0,00 18,38 3,40 2,00 2,10 5,78 7,00 2,15 2,00 2,20 0,00 0,00 3,00 0,00 0,00
 
WP1.2 DL Creation & Management

Design and implement the following DILIGENT components: Information Service, Broker and MatchMaker Service, Keeper Service, Dynamic VO Support Service, VDL Generator Service.

D 1.2.1 DL Creation & Management services specification interim report (pdf)
D 1.2.2 DL Creation & Management services specification report (pdf)
D 1.2.3 DL Creation & Management services detailed design report
From M6 to M34
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
167,99 0,00 79,34 5,10 0,00 0,00 0,00 10,85 72,70 0,00 0,00 0,00 0,00 0,00 0,00 0,00
 
WP1.3 Content & Metadata Management

Design and implement the following content services: Content Management Service, Wrapper and Monitor Services, Content Security Service, Metadata Management Service, Annotation Service, Metadata Broker

D 1.3.1 Content & Metadata Management services specification interim report (pdf)
D 1.3.2 Content & Metadata Management services specification report
D 1.3.3 Content & Metadata Management services detailed design report
From M8 to M34
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
100,84 0,00 0,00 0,00 2,00 70,00 18,84 0,00 0,00 10,00 0,00 0,00 0,00 0,00 0,00 0,00
 
WP1.4 Index & Search Management

Design and implement the following services:  Data Fusion Service, Content Source Description & Selection Service, Personalization Service, Index Service, Search Service, Feature Extraction Service

D 1.4.1 Index & Search services specification interim report (pdf)
D 1.4.2 Index & Search services specification report
D 1.4.3 Index & Search services detailed design report
From M8 to M34
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
150,57 0,00 3,54 47,10 1,00 8,00 13,23 0,00 0,00 35,00 40,20 0,00 0,00 0,00 0,00 2,50
 
WP1.5 Process Management

Provide process support that allows combination of existing services into processes, thereby implementing distributed, reliable DL applications on top of the underlying grid infrastructure.

D 1.5.1 Process Management services specification interim report (pdf)
D 1.5.2 Process Management services specification report
D 1.5.3 Process Management services detailed design report
From M8 to M34
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
55,51 0,00 0,00 10,20 0,50 0,00 13,31 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 31,50
 
WP1.6 User-Community specific applications

Implement instances of the DILIGENT Application Specific Layer for two example application domains in support of their e-Science processes, in order to validate the DILIGENT approach and to showcase its advantages.

D 1.6.1 User-Community specific applications specification interim report (pdf)
D 1.6.2 User-Community specific applications specification report
D 1.6.3 User-Community specific applications detailed design report
From M8 to M34
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
67,609 0,00 3,95 9,00 0,00 18,00 2,40 0,00 0,00 0,00 6,00 9,00 5,00 0,00 13,00 1,25
 
WP1.7 Test-bed testing

Develop an applicable testing strategy for Grid testing and the whole test-bed. Create a system test specification and the related test case set. Create component and integration test specification and the related test case set

D 1.7.1 Functional test plan (ex System test plan) (pdf)
D 1.7.2 System test plan (ex Component & Integration test plan)
D 1.7.3 Test summary report
From M6 to M35
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
101,50 0,00 5,60 2,00 0,00 2,00 2,00 6,75 14,15 1,00 2,00 0,00 0,00 64,00 0,00 2,00
 
WP1.8 Integration and deployment

Integration, building, deployment, and delivery process of the DILIGENT software.

D 1.8.1 Integration activity report
From M18 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
55,10 0,00 9,00 5,00 0,00 8,00 2,00 11,10 10,00 2,00 2,00 2,00 0,00 2,00 0,00 2,00
 
WP2.1 ARTE scenario

Collect and analyze the requirements of the ARTE scenario users, in order to devise the specifications needed from WP1.6 for implementing the scenario.

D 2.1.1 ARTE scenario requirements analysis report (pdf)
D 2.1.2 ARTE scenario functional feedback report (pdf)
D 2.1.3 ARTE scenario acceptance report
From M1 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
26,00 0,00 8,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 17,00 0,00 0,00 0,00
 
WP2.2 ImpECt scenario

Identify user requirements from the environmental user-community on the basis of the ImpECt scenario through close interaction with this community. Provide feedback.

D 2.2.1 ImpECt scenario requirements analysis report (pdf)
D 2.2.2 ImpECt scenario functional feedback report (pdf)
D 2.2.3 ImpECt scenario acceptance report
From M1 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
29,00 0,00 0,00 0,00 0,00 7,00 0,00 0,00 0,00 0,00 0,00 22,00 0,00 0,00 0,00 0,00
 
WP3.1 EGEE-DILIGENT Interaction

Represents the basis for the development of the knowledge management application oriented Grid components and collects the results of the analysis, design and experimentation of the DILIGENT Grid infrastructure.

D 3.1.1 EGEE-DILIGENT interaction report (Report 1: pdf, Report 2: pdf)
From M1 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
53,69 0,00 27,54 0,00 0,00 0,90 0,00 25,25 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
 
WP4.1 Training
Plan and organize internal training activities that allow for an information exchange within the DILIGENT consortium and between DILIGENT and the EGEE.
D 4.1.1 Training-support Enviornment (pdf)
D 4.1.2 Training plan
D 4.1.3 Training activities report
From M6 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
64,88 0,00 30,00 1,00 0,00 5,00 4,00 0,00 18,88 3,00 0,00 0,00 0,00 0,00 0,00 3,00
 
WP4.2 Dissemination
Disseminate project findings to the widest extent possible through several roadmaps and manage cooperation between DILIGENT and other relevant initiatives.
D 4.2.1 Project Web Site (pdf)
D 4.2.2 Dissemination Plan (pdf)
D 4.2.3 Liaison and Dissemination Activities report (pdf)
From M1 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
47,64 6,00 15,20 9,80 0,00 1,00 1,75 3,00 2,94 4,00 2,00 0,70 0,00 0,00 0,00 1,25
 
WP4.3 Exploitation
Definition of the preliminary Sustainability Plan in order to understand the framework in which DILIGENT will move in the future.
D 4.3.1 Market and technology trends analysis (pdf)
D 4.3.2 Initial exploitation and sustainability plan (pdf)
D 4.3.3 Market watch
D 4.3.4 DILIGENT preliminary/final business reports
From M1 to M35
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
24,60 0,00 3,20 0,00 0,00 3,00 0,50 2,05 10,35 0,00 4,00 1,00 0,00 0,00 0,00 0,50
 
WP4.4 Demonstration
Shape the intermediate and final research results into some demos, for  attracting the attention of managers and decision makers of potential target communities onto DILIGENT concepts and capabilities
D 4.4.1 Preliminary Demonstration plan (pdf)
D 4.4.2 Updated demonstration plan and activity report - interim
D 4.4.3 Demonstration activity report - final
From M7 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
41,78 0,00 15,00 2,00 0,00 2,50 2,68 0,00 11,10 3,00 2,00 2,00 0,00 0,00 0,00 1,50
 
WP4.5 Project Management
Ensure governance and co-ordination at the global Integrated Project level, the achievement of the project objectives and contractual obligations, resource management, innovation aspects and the relations with the EC.
D 4.5.1 Yearly quality plan (pdf)
D 4.5.2.x Bi-monthly management reports: 2(pdf), 4(pdf), 6(pdf), 8(pdf), 10(pdf), 12(pdf),
D 4.5.3 Annual financial report
D 4.5.4 Update management plan
From M1 to M36
TOTAL ERCIM CNR UoA ETH FhG UMIT CERN ENG USG FAST ESA SNS 4DSOFT RAI UNIBAS
42,03 20,00 18,00 0,00 0,00 2,00 0,00 0,00 2,03 0,00 0,00 0,00 0,00 0,00 0,00 0,00
 

 

ERCIM European Research Consortium for Informatics and Mathematics
CNR-ISTI Consiglio Nazionale delle Ricerche
UoA University of Athens
ETH Swiss Federal Institute of Technology Zurich
FhG/IPSI Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
UMIT University for Health Informatics and Technology Tyrol
CERN European Organization for Nuclear Research
ENG Engineering Ingegneria Informatica SpA
USG University of Strathclyde
FAST Fast Search & Transfer ASA
ESA European Space Agency
SNS Scuola Normale Superiore
4D SOFT 4D SOFT Software Development Ltd.
RAI RAI Radio Televisione Italiana
UNIBAS University of Basel